Saturday, May 24, 2014
Bunker Renovation Update
I have included a slide show of the bunker renovation. The slide show consists of pictures during the process of renovating the bunkers. These include drainage, erosion fabric and sand installation. There are some pictures of numbers painted on the floor of the bunker. The numbers designate the linear footage of drainage pipe and gravel installed in each bunker. The slide show also will aid in determining the routing of the drainage pipe for future reference. There are instances where the drainage could possibly be impacted (crushed or clogged). The pictures will show the routing if there are necessary repairs in the distant future.